Ostrea Solar

Helping power America’s fastest growing state economy while caring for the land

About the Project

Cypress Creek’s Ostrea Solar project brings new, affordable and locally generated electricity to Washington as the state leads the U.S. in economic growth. Long-term land stewardship initiatives conserve critical habitat, support wildlife migratory paths and restore healthy native vegetation across the project site.

Microsoft, headquartered in Redmond, Washington, is the offtaker for the project, which is interconnected to the Bonneville Power Administration transmission system, adding new generation to the region’s power system.

Key Project Facts

104 MWdc Solar Capacity

to meet rising demand and support the state’s continued economic success

Yakima County, Washington

grid-connected locally generated power for regional energy needs

$180M Private Capital

investment in long-term Washington energy infrastructure

September 2026

commercial operations start date

Strengthening Yakima County and Washington

Ostrea Solar was developed to deliver long-term benefits to Yakima County and the surrounding region. The project supports local jobs, generates new tax revenue, and helps power the region’s growing electricity demand. Thoughtful land management and environmental stewardship are also built into the project for its entire operating life.

$13.3 Million Tax Revenue

with new tax dollars supporting state and local priorities over the project’s operating life

300 Construction Jobs

with 75 apprentices who gained experience and skills for long-term careers

Land Stewardship

including planting of native grasses and pollinator-friendly flowering plants to support biodiversity and long-term soil health

Community Investments

through direct Cypress Creek donations supporting scholarships, educational opportunities and community resources

275 Acres Conserved Shrubsteppe Habitat

along with funding to the Washington Department of Fish and Wildlife (WDFW) for additional conservation initiatives

Wildlife Corridors

to maintain migratory pathways through the project area, including for Rocky Mountain elk

Our Community Commitment

As a long-term owner and operator of energy infrastructure, we approach every project with a commitment to responsible development, partnership, and lasting local benefits. At Cypress Creek, we believe our work should leave communities stronger and we work to ensure each project aligns with local priories and values.

Caring for the Land

Ostrea Solar was designed with wildlife corridors to maintain migratory pathways through the project area, including for Rocky Mountain elk.

Cypress Creek also worked with EFSEC and the WDFW, modifying the project design to conserve approximately 275 acres of critical shrubsteppe habitat, a threatened ecosystem found nowhere else in the state. 

Portions of the site included degraded former cropland not actively farmed for more than 25 years and overgrown with invasive and non-native plant species. During construction, invasive plants that threaten native habitats were removed, and the site was seeded with selected grasses and pollinator-friendly flowering plants.

Community Investments

Cypress Creek believes communities hosting energy projects should benefit from investments that reflect local priorities.

At Ostrea’s groundbreaking, we donated $25,000 to East Valley School District. In Yakima County, Cypress Creek has also contributed $50,000 to the new aquatic center at Martin Luther King Jr. Park and participated in a back-to-school drive at Moxee Elementary School.

Fourteen Yakima County students have received $18,500 in scholarships through Cypress Creek’s Energizing Tomorrow’s Leaders program.

Cypress Creek has also partnered with Oregon Institute of Technology to provide scholarships and educational opportunities for students pursuing energy careers.

Project Updates and Stories

Stay informed about important updates, insights, and stories about Ostrea Solar, including project milestones and community announcements.

 

Cypress Creek Energy’s Ostrea Solar Reaches Commercial Operation, Helping Power Nation’s Fastest-Growing State Economy

September 2, 2026

 

Cypress Creek Renewables secures $150 Million in financing and begins construction on 104MW Ostrea Solar project in Washington State

May 5, 2025

Information and Resources

Find additional information about Ostrea Solar, including project documents, FAQs, and other helpful resources.

 

Solar Energy FAQs

Meet the Project Team

Stacy Gramazio

Senior Director, Community Affairs

Stacy Gramazio has been with Cypress Creek since 2022, supporting the development of energy projects across the United States. Prior to joining the company, she spent more than a decade working in public affairs for Arizona’s mining industry. Stacy is a graduate of the University of Arizona and lives in Gilbert with her husband and two teenage sons. Outside of work, she enjoys hiking the San Tan Mountains and listening to true crime podcasts.

John Hanks

Director, Development

John is originally from the Pacific Northwest, but he now calls LA his adopted home. When he’s not working on developing solar projects, you can usually find him outdoors, enjoying nature. As an avid surfer, fisherman, hiker, biker, and camper, John is always on the lookout for new adventures. Yet, no matter how exciting the journey, he’s always grounded by what matters to him most – his family.

Get in touch today

Contact us

Please enable JavaScript in your browser to complete this form.
What are you contacting us about?